| The scope of the project included an
instructional/office building, structural burn building, burn pad and
simulated flammable liquids burn pit which were
outfitted with propane burn module simulators. Also included in
the complex was a flammable gas burn pad, a drafting tank, and
an automobile extrication area. The site had extensive areas of
wetlands which necessitated careful site design and location of
the buildings, access road and fire training evolution areas. A
holding pond was constructed to provide water for site use in
the training exercises. The grading and drainage were designed
to allow the water used in the exercises to be recycled back to
the pond. |
|
 |
| Training & Administration
Building |
|
 |
| Burn Building |
|
|
|